Maintenance & Service

Production Continuity Without Waiting for Imported Parts

A critical parts list, a stock plan and local machining eliminate weeks of waiting for imported parts.

With foreign-made machines a single part can take weeks to arrive, and the line stands still in the meantime. We recommend three steps for production continuity:

1. A critical parts list

Identify wear parts such as the mixing head piston and seals, injectors, filter elements, sensors and hoses.

2. Minimum stock

Keep one set on hand that can get the line running again after a breakdown.

3. A local supplier

MTS Otomasyon makes spare parts for all machines used in the polyurethane industry in its own machining facility and ships from a wide stock straight away. A part number, photo or sample is all we need.

Related Articles

All Articles
Your Production Matters to Us

Machine down? Your production matters to us.

Fill in the service form or message us on WhatsApp — our technical team will get back to you shortly.