Maintenance & Service

Polyurethane Machine Preventive Maintenance Checklist

Daily, weekly, monthly and yearly maintenance steps in one checklist you can print and hang next to your machine.

Daily

  • Material levels and temperatures
  • Injector and hydraulic pressures
  • Cleaning the outside of the head, checking for leaks

Weekly

  • Checking and cleaning the filters
  • Checking hoses and fittings for wear
  • Checking the desiccant (moisture trap) cartridges

Monthly

  • Verifying ratio / metering calibration
  • Hydraulic oil level and colour
  • Checking connections and fans inside the cabinet

Yearly

  • Assessing the mixing head for overhaul
  • Pump and motor maintenance
  • Testing heaters and sensors, general service report

Contact our service team for a preventive maintenance programme tailored to your machine.

Related Articles

All Articles
Your Production Matters to Us

Machine down? Your production matters to us.

Fill in the service form or message us on WhatsApp — our technical team will get back to you shortly.